German Data Centre
Skanska
Healthcare
Cambridge, UK
Completed late January 2018
The new hospital has been designed to combine a highly efficient clinical layout with a stunning external appearance and set in beautifully landscaped grounds. It boasts being a pioneering heart and lung treatment and transplant centre of excellence.
The 40,000sqm hospital has 310 beds, six operating theatres and six catheterisation labs.
Building information modelling (BIM) technology was used to maximise energy efficiency and map all the building services. A clear plan of all the facilities ensures the hospital has long-term flexibility regarding the changing use of spaces. The technology was also used to engage clinicians during the construction process.
Our Contribution mainly involved:
We effectively collaborated with all other trades to complete the high specifications of this project
Successful use of the Bluebeam App enabled us to collaborate on pdf documents in real time
The project was designed to achieve an EPC “B” energy rating, the first hospital in the UK to do so
We connected to 275 Chilled Beams, 322 Radiant Panels, 42 Special Fan Coil Units and further domestic water connections