Luxury Hotel Project

A luxury and prestigious Grade II listed hotel set in the district of Mayfair that will perfectly fit within its lucrative surroundings

Project Summary

ClientIcon for client
Main Contractor

Multiplex

SectorIcon for sector
Sector

Hotel & Retail

LocationIcon for location
Location

London, UK

Under-constructionIcon for under-construction
Status

In Progress

Project Details

A luxury hotel is set to open in 2024 in London’s prestigious Mayfair District.

The Grade II listed building will include spacious guest rooms and suites with publicly accessible spaces including a variety of formal and casual dining and entertainment spaces, and a state-of-the-art wellbeing facility to provide guests with a retreat from the busy streets of London. In addition, five flagship retail spaces and a grand ballroom will provide ample space for social activities.

Our Contributions

Our Contribution mainly involves:

  • Full Mechanical and Public Health Water Side design and build package
  • Mechanical and Public health pipework shell and core installations serving hotel suites
Luxury Hotel Project luxury hotel project image 1
Luxury Hotel Project luxury hotel project image 2
Luxury Hotel Project luxury hotel project image 3
Luxury Hotel Project luxury hotel project image 4
Luxury Hotel Project luxury hotel project image 5
Luxury Hotel Project luxury hotel project image 6
1 / 6 Arrow-leftIcon for arrow-left Arrow-rightIcon for arrow-right

Project Highlights

Award Winning Team

Within the first 12 months we were granted by the Contractor a Safety Award and Supervisor of the Month Award

100% Sustainability Record

We have achieved 100% in each monthly Environmental and Sustainability record submission to the client to date

Health & Safety Top Spots

Three of our construction supervisors have won the monthly health and safety award on the project in the duration of eight months

Rapid Installation

All eight dry air coolers have been installed by us in June 2022

QuoteIcon for quote

It’s been an excellent week, being able to record all 8 coolers on the grillage is a fantastic achievement by the whole team. Please pass on my thanks to everyone involved as it’s a real team effort.

QuoteIcon for quote

Richard Rockenbach
Director (Multiplex)

Back to Top Arrow-upIcon for arrow-up