Kings Cross S2 kings cross s2 case study banner Kings Cross S2 kings cross s2 case study thumbnail mobile 1

Kings Cross S2

Building S2 is a Grade A office building overlooking Lewis Cubitt Park and Handyside Street. It is now fully let by Google.

Project Summary

ClientIcon for client
Main Contractor

Carillion / Midgard

SectorIcon for sector
Sector

Multisector

LocationIcon for location
Location

London, UK

CompleteIcon for complete
Status

Completed December 2019

Project Details

Building S2 is a commercial building totalling 190,000 Sq ft of space.

As with all the office buildings at King’s Cross, the very latest technology will reduce running costs and minimise environmental impact.

The building is being designed to meet the BREEAM standard ‘Outstanding’ and will be linked to the site-wide district heating network. This network provides close to 100% of the development’s heating and hot water needs, as well as 80% of electricity demand. The building has been designed to maximize the environmental benefits of its location. Orientation, thermal modelling and the use of thermal mass for cooling all contribute to energy efficiency.

Our Contributions

Our Contribution mainly involved:

  • Mechanical LTHW & CHW pipework installation including CAT A fit out.
  • Gas pipework installation
  • Underfloor Heating installation
  • Public Health Gravity Foul and waste Drainage installation
  • Rainwater Drainage installation
  • Grease Clean out line
  • Pumped Drainage
  • Condensate Drainage
  • Domestic Mains, Hot & Cold Boosted Water Systems.
  • Domestic Soft water system.
  • Domestic Non – Potable water CAT 5 installation.
Kings Cross S2 kings cross s2 project image 1
Kings Cross S2 kings cross s2 project image 2
1 / 2 Arrow-leftIcon for arrow-left Arrow-rightIcon for arrow-right

Project Highlights

Business Continuity

After the collapse of Carillion in January 2018, we continued to work with the new contractor to ensure satisfactory completion of the project

Sustainable Validation

This project looks to achieve a BREEAM Outstanding rating and we are proud to play our part in the energy efficiency objectives

4KM of Installation

We successfully installed 4km of domestic water services

Local Recruitment

We recruited local employees as part of our social engagement strategies