A Six storey office building of 88,600 Sq ft immediately east of Smithfield Market boasting enviable views over Charterhouse Square and towards St Paul’s Cathedral

Project Summary

ClientIcon for client
Main Contractor

Mace

SectorIcon for sector
Sector

Commercial

LocationIcon for location
Location

London, UK

CompleteIcon for complete
Status

Completed late 2020

Project Details

The Farringdon East OSD Project consists of 5 CAT A floors, mezzanine plant area, roof and reception. The floorplates range from 14,000 Sq ft to 19,500 Sq ft and the building benefits from a communal rooftop terrace of 5,000 Sq ft together with 112 cycle spaces, showers and its own loading bay.

Our Contributions

Our Contribution mainly involved:

  • Mechanical LTHW & CHW Shell & Core pipework installation including CAT A fit out
  • Public Health Foul drainage pipework installations including fit out of Toilet cores
  • Rainwater drainage pipework installation
  • Domestic Water H & C installation Including non-potable CAT 5 system
  • Pump drainage installations
  • Gas pipework installation
  • Fuel Delivery pipework installation
Farringdon East farringdon east project image 1
Farringdon East farringdon east project image 2.jpg
1 / 2 Arrow-leftIcon for arrow-left Arrow-rightIcon for arrow-right

Project Highlights

Partnering with CrossRail

We worked with CrossRail to plan, programme and install pipework connections to the existing district heating systems.

Pipework Design

The district mains penetrates the main reception slab and runs up to the mezzanine level so an eye-catching design was created to disguise this.

Sustainable Materials

All our Public Health Systems used water saving components to achieve a good BREEAM rating.

Sustainable Validation

This project was awarded the first UK BREEAM 2018 New Construction rating of Outstanding.

QuoteIcon for quote

This was a well-managed and structured project, with all parties, including Crossrail working well together. Our works were completed to a high standard, without defect and using water saving components to achieve a good BREEAM rating. We are particularly delighted by the eye-catching design around the district mains which had to be incorporated into the building.