Damac Tower

A residential and Commercial development that consists of a 50-storey North Tower and a 24-storey South Tower, situated in Nine Elms on the South Bank, in the midst of a multi-billion pound investment that is transforming the area.

Project Summary

ClientIcon for client
Main Contractor

Multiplex

SectorIcon for sector
Sector

Multisector

LocationIcon for location
Location

London, UK

CompleteIcon for complete
Status

Completed January 2022

Project Details

A development that consists of a 50-storey North Tower and a 24-storey South Tower, situated in Nine Elms on the South Bank. The North Tower features interiors by Versace Home and provides 360 residential units, five storeys of office space and a connecting sky bridge to the South Tower, which is topped by an extensive roof garden at level 23. The apartments offer winter gardens with panoramic views of the city. The South Tower also incorporates 90 affordable housing units.

The scheme also hosts 419,093 Sq. ft of office space and 11,785 Sq. ft of ground level retail space.

Our Contributions

Our Contribution mainly involved Public Health Systems, consisting of:

  • Design Verification
  • Shell & Core Gravity Foul Drainage installation
  • Shell & Core Gravity Attenuated Rainwater Drainage installation
  • Pumped Drainage
  • Condensate Drainage
  • Shell & Core Domestic Mains & Boosted Cold Water Inc Plant
  • Domestic Non – Potable water CAT 5 installation including Plant
  • Concrete attenuation tank liners and accessories
  • Complete Drainage and Domestic H & C water within Landlord Fit Out areas including Sanitaryware and Water Leak Detection Installations.
  • Swimming pool backwash discharge system
Damac Tower damac tower project image 4
Damac Tower damac tower project image 3
Damac Tower damac tower project image 2
Damac Tower damac tower project image 1
Damac Tower damac tower project image 5
Damac Tower damac tower project image 6
Damac Tower damac tower project image 7
1 / 7 Arrow-leftIcon for arrow-left Arrow-rightIcon for arrow-right

Project Highlights

Social Engagement

We were proud to have hosted and participated in numerous Fundraising and Community works throughout the project

10 miles of Drainage Pipework

We successfully installed 10 miles of drainage pipework in the North Tower alone

Drainage Stacks Installed with speed

We successfully installed 100 plus drainage stacks including framework within the week timeframe given to us

99% Sustainability Performance

We achieved an overall 99% Score for our Sustainability Performance for the entire duration of the project

QuoteIcon for quote

We are very satisfied with JA Brook’s overall performance – delivering works to a high standard and taking pride in their work. The good on-site work was mirrored with high quality documentation and record keeping of testing/commissioning information. I personally hope to work with you again as a trustworthy company with high standards.

QuoteIcon for quote

Thomas Megeary
MPE Project Engineer (Multiplex)

Back to Top Arrow-upIcon for arrow-up