20 Ropemaker Street 20 ropemaker street case study banner 20 Ropemaker Street 20 ropemaker street case study thumbnail mobile 1

20 Ropemaker Street

A striking multi-use building offering office and retail space with sustainable construction techniques at its heart

Project Summary

ClientIcon for client
Main Contractor

Skanska

SectorIcon for sector
Sector

Commercial & Retail

LocationIcon for location
Location

London, UK

Under-constructionIcon for under-construction
Status

In Progress

Project Details

The project consists of 419,093 Sq. ft of office space and 11,785 Sq. ft of ground level retail space.

This includes the creation of a double-height entrance and lobby along Ropemaker Street close to Moorgate Tube Station and a separate dedicated cycle entrance.

Occupiable office space will cover 22 floors, with five accessible roof terraces. Three basement levels are provided for retail servicing, plant, facilities management, cycle and shower facilities.

The project has sustainable construction techniques at its heart including efficient use of water and energy; zero waste to landfill; and the use of materials that mitigate the impact of our operations on ecosystems.

Our Contributions

Our contribution mainly involves:

  • Mechanical LTHW & CHW Shell & Core Installation including
    the Fit Out at levels 14 to 25
  • Condenser Water Services pipework system installation
  • Condensate Drainage installation
  • Gas pipework system installation
  • Prefabrication of the Mechanical Services Plant Skids
20 Ropemaker Street ropemaker street project image 1
20 Ropemaker Street ropemaker street project image 2
20 Ropemaker Street ropemaker street project image 3
1 / 3 Arrow-leftIcon for arrow-left Arrow-rightIcon for arrow-right

Project Highlights

2nd Place

We are currently 2nd place in the Contractor’s League Table

Successful Start with Plantroom Skids

We started the project well with the delivery and position of the plant room skids

Zero Waste

The project aim is to have zero waste to landfill sites.

Eco Friendly Techniques

We are proud to engage with the sustainable construction techniques required of this project

QuoteIcon for quote

The construction work is well underway, with the mechanical installation work in the basement level plantrooms nearing completion and the level 11 mechanical plantroom works due to start. This includes six prefabricated pump and plate heat exchanger skids that are in manufacture and to be delivered by the summer of 2022

QuoteIcon for quote

Joe Wu
Project Director